Bridge Beam Mould

CLIENT:

Partnership with an industry client to advance bridge construction.

 

CHALLENGE:

To create a specialised bridge beam mould as an alternative to traditional super tee beams for long-spanning bridge projects.

 

SOLUTION:

Kings Engineering developed an innovative mould design for producing expansive bridge beams, utilising high tensile steel prestressing strands to bolster the beams’ strength and load-bearing capabilities.

 

OUTCOME:

The project resulted in a significant advancement in bridge construction techniques in New Zealand, with Kings Engineering at the forefront of this engineering breakthrough.



Contact us for your next project

Previous
Previous

Double Tee Beam Mould

Next
Next

Omaroro Reservoir